| Scope | Description |
| Simpledo | Compliance Management, preventive and corrective actions June 2012 |
| Training | Review of training plan December 2011 |
| BBS | 50% reduction of injuries in departments with BBS applied June 2012 |
| Training/Informing personnel involved December 2012 |
|
| Application of system June 2013 |
|
| Examination of results December 2013 |
|
| Noise | Scrutiny of the efficacy of the older PPEs December 2013 |
| Works at height | Implementation of lifelines in Cartiere del Garda (Autostore
and Transformer Cabinet) December 2012 |
| Manual handling | Implementation of dedicated training plan for tasks exposed to
specific risks December 2013 |
| Mechanised handling | Feasibility study for the creation of a protective walkway for
pedestrian access to the canteen December 2012 |
| Sample speed control of reel transport shuttle truck using
tachograph December 2012 |
|
| Confined spaces | Implementation of dedicated training plan for tasks exposed to
specific risks December 2013 |
| Electricity hazard | Alteration of the opening of medium voltage electrical control
panels (A3, A10) to enable thermography without access to the
adjacent zone August 2012 |
| In the event of a power supply to cabinet A2 from A1, provision
to prevent PCC 6kV supply in A2 with two MV/MV transformers in
parallel (excluding temporary manoeuvres or emergency) Settembre 2012 |
|
| Verification and updating of the calibration tables of the
medium voltage protection, according to the new configurations
required with the connection to Alto Garda Power December 2012 |
|
| Implementation of a more effective coupling system for key
couplings December 2011 |
|
| Periodic verification of the correct operation of the alarm
notification system from the isolation control panels; restoration
of the signalling to the guarded location December 2012 |
|
| Prompt verification of the calibration of the PCC switches for
the 2nd earth trip December 2012 |
|
| Verification of the reference/notification systems of earth
failure of the circuits supplied by UPS August 2013 |
|
| Chemical hazard | Incremental installation of emergency showers and eyewash
stations Novembre 2010 |
| Update of Simpledo software in line with new regulations for
chemical substances and compounds June 2012 |
|
| Asbestos | Removal of asbestos remaining on-site(see environmental
improvement 38) 2020 |
| ATEX hazard | Creation of ATEX alarm management procedure in coatings
section June 2012 |
| Artificial optical radiation | Analysis and implementation of corrective measures June 2012 |